Soft strip, light demolition, removal of existing partitions and ceilings and area preparation ahead of a fit out or refurbishment, delivered by the same team that will build the new interior. Taking the strip out and the drylining as one package means the site goes from occupied to boarded without a gap between contractors.

Existing partitions, ceilings, linings, joinery and fixtures taken down, segregated and cleared, with the waste transfer paperwork kept for the file.
Non structural blockwork and masonry, openings and infills, and the builders work that sits between the strip out and the new layout.
Floors, walls and soffits cleaned back and made ready for setting out, so the fit out starts on a clean slab rather than around someone else's leftovers.
Unistrut, service support frameworks and basic joinery works installed as part of the enabling stage where the specification asks for them.
Yes, though it is most useful as the first stage of a drylining package. Where RWS strips the unit and then builds the new partitions and ceilings, there is no hand over between contractors and no argument about the condition of the slab.
No. The demolition side of the package is light and non structural: blockwork, openings, existing partitions and ceilings. Structural work is for a demolition contractor working to an engineer's method statement.
Yes, and it is a regular request. The strip out is phased and often done out of hours so the rest of the centre or the building keeps trading, with the site hoarded and the waste taken out on an agreed route.
Segregated on site where there is room, skipped or carted where there is not, with waste transfer notes kept for the file. Hazardous materials are dealt with by the appropriate specialist before we start.
Yes. Unistrut, service support frameworks and basic joinery are part of the enabling scope where the drawings call for them, installed before the linings and ceilings close the void.
The yard and office are in Rotherham and South Yorkshire and the M1 corridor are the weekly patch, but the teams travel. The list below is where the packages come from most often, not a boundary.

All metal stud, Metsec SFS, set out and boarded square.

Independent linings, sound-rated and fire-rated walls, built to the tested spec.

Metal frame, suspended grid and tile, acoustic and fire-rated ceilings.

Fire stopping and fire-rated installations, certificated and signed off.

Tape and joint, skim, render and high-spec internal finishes.
Free, no-obligation quotations on every package, anywhere in the UK.