Home/Services/Partitions & SFS
Service 01 · Metal Stud Partitions & SFS

Metal stud partitions and SFS, UK wide

Metal stud partitions and steel frame systems set out from the drawing, fixed plumb and boarded square, on commercial, retail, education and healthcare projects across the UK. RWS Plastering and Drylining Ltd has installed partition packages for main contractors since 2010, as a standalone scope or as part of a full drylining package.

Metal stud partitions set out on site, RWS Interiors
Metal stud partitions set out on site

Every partition package, covered

01.1

Metal stud partitions

Standard and heavy duty metal stud systems set out to the partition layout, with deflection heads, pattresses, door openings and service zones built in as the wall goes up rather than cut in afterwards.

01.2

Metsec and SFS

Steel frame infill and oversail systems installed to the engineer's design, set out, fixed and sheathed ready for the external envelope and the internal linings.

01.3

Boarded to the spec

Board layers, fixing centres and joint staggers follow the system specification, so a rated or acoustic partition performs as the certificate says and not just as it looks.

01.4

Coordinated with the trades

Partitions are sequenced with M and E first fix and the ceiling package, and our SSSTS supervisors run the job on site so the programme holds.

Asked and answered

Do you install SFS as well as internal partitions?

Yes. Metsec and other steel frame systems are a regular part of the package, installed to the engineer's design and sheathed ready for the facade contractor. On many schemes the SFS goes in first and the same team returns for the internal partitions and linings.

Can you build fire rated and acoustic partitions?

Yes. Rated partitions are built to the tested system, with the board layers, fixings and head details the certificate requires. Where the wall forms part of the fire strategy, the fire stopping through it is installed by our own passive fire team and recorded.

How do you set out partitions?

From the drawing and off instrument, with the partition lines, door positions and service zones marked before the first track is fixed. Setting out is where a partition package is won or lost, so it is done once and checked rather than adjusted as the boards go up.

What size of package do you take on?

Anything from a single floor of partitions on a refurbishment to a full drylining package on a new build. Recent work covers retail units, showrooms, cinema and leisure venues, school blocks and healthcare units, so the range is wide.

How do you price a partition package?

Off the drawings, the specification and the programme. Send them across and we will come back with a price and a start date, and there is no charge for the quotation.

Metal Stud Partitions & SFS across the UK

The yard and office are in Rotherham and South Yorkshire and the M1 corridor are the weekly patch, but the teams travel. The list below is where the packages come from most often, not a boundary.

The rest of the package

Independent wall linings boarded out
02

Wall Linings & Rated Systems

Independent linings, sound-rated and fire-rated walls, built to the tested spec.

Sound-ratedFire-ratedTested systems
Suspended grid and tile ceiling
03

Ceiling Systems

Metal frame, suspended grid and tile, acoustic and fire-rated ceilings.

Metal frameGrid and tileAcoustic
Fire-rated ceiling and soffit installation
04

Passive Fire Protection

Fire stopping and fire-rated installations, certificated and signed off.

Fire stoppingRated installsCertificated
Finished plastered interior with shadow gap detail
05

Tape, Joint & Plastering

Tape and joint, skim, render and high-spec internal finishes.

Tape and jointSkimRender
Stripped out retail unit ready for fit-out
06

Strip-Out & Enabling Works

Strip-out, light demolition and area prep ahead of fit-out.

Strip-outLight demolitionArea prep

Planning a partition package? Send us the drawings.

Free, no-obligation quotations on every package, anywhere in the UK.

Get a quote

Send over the drawings, the spec or just a rough scope and a programme date. We will come back with a price and a start date, and there is no charge for the quotation.

Office 
Email 
Head Office 
HoursMonday to Friday, 7am to 5pm