Hull is an hour east along the M18 and M62, and the healthcare estate, the Fruit Market regeneration and the city centre retail are the usual reasons the vans head that way. Partitions, SFS, wall linings, ceilings, fire stopping and plastering in Hull for main contractors and fit-out companies.

Much of the work in Hull is conversion and refurbishment of older commercial stock, where the existing walls are rarely straight and the linings and ceilings have to hide a century of services. In practice most of what we are asked for in Hull is healthcare, with the rest of the package available alongside it.

All metal stud, Metsec SFS, set out and boarded square.

Independent linings, sound-rated and fire-rated walls, built to the tested spec.

Metal frame, suspended grid and tile, acoustic and fire-rated ceilings.

Fire stopping and fire-rated installations, certificated and signed off.

Tape and joint, skim, render and high-spec internal finishes.

Strip-out, light demolition and area prep ahead of fit-out.
Across Hull (HU1) it is mostly healthcare, city centre retail and leisure, port side offices, with partitions, SFS, wall linings, ceilings, fire stopping and plastering all covered by the same company. Much of the work in Hull is conversion and refurbishment of older commercial stock, where the existing walls are rarely straight and the linings and ceilings have to hide a century of services. Every package is priced off the drawings and the programme, free of charge.
No. Hull is around 47 miles out, which is a normal run for us. Travel is priced into the package rather than added on top, and on a multi week scheme the team is on site for the duration.
Hull is an hour east along the M18 and M62, and the healthcare estate, the Fruit Market regeneration and the city centre retail are the usual reasons the vans head that way. If your scheme is near Hull Royal Infirmary, send the drawings across and we will tell you what the building type usually means for the drylining package before anyone prices it.
Yes. In Hull a lot of the buildings were something else first, so the existing walls are rarely plumb and the soffits are full of old services. We set out from a datum rather than from the walls, and the linings and ceilings are framed to hide what is there.
Yes. The passive fire work is carried out by RWS Contracts Ltd, the group's IFC certificated fire division, which shares the same office and management team. On schemes in Hull the rated walls, the ceilings and the fire stopping through them can be let as one package with one point of responsibility.
Hull is about 47 miles from the Rotherham yard, so a site visit is normally arranged within a week or two. Starting the works depends on the current contracts, and we would rather give you a real date against your programme than an optimistic one.
Free, no-obligation quotations on every package, anywhere in the UK.