Wakefield sits straight up the M1 from Rotherham, and the distribution parks at Junction 41, the hospital estate and the town centre retail are where the packages there come from. Partitions, SFS, wall linings, ceilings, fire stopping and plastering in Wakefield for main contractors and fit-out companies.

Wakefield is a mix of retail parks, showrooms, schools, healthcare and industrial offices, where the drylining package is usually clear and the job is delivering it on programme. In practice most of what we are asked for in Wakefield is healthcare, with the rest of the package available alongside it.

All metal stud, Metsec SFS, set out and boarded square.

Independent linings, sound-rated and fire-rated walls, built to the tested spec.

Metal frame, suspended grid and tile, acoustic and fire-rated ceilings.

Fire stopping and fire-rated installations, certificated and signed off.

Tape and joint, skim, render and high-spec internal finishes.

Strip-out, light demolition and area prep ahead of fit-out.
Across Wakefield (WF1) it is mostly healthcare, distribution offices, retail and residential refurbishments, with partitions, SFS, wall linings, ceilings, fire stopping and plastering all covered by the same company. Wakefield is a mix of retail parks, showrooms, schools, healthcare and industrial offices, where the drylining package is usually clear and the job is delivering it on programme. Every package is priced off the drawings and the programme, free of charge.
No. Wakefield is roughly 18 miles from the Rotherham yard, well inside the weekly patch, so travel sits inside the package price and a site visit is quick to arrange.
Wakefield sits straight up the M1 from Rotherham, and the distribution parks at Junction 41, the hospital estate and the town centre retail are where the packages there come from. If your scheme is near Trinity Walk, send the drawings across and we will tell you what the building type usually means for the drylining package before anyone prices it.
Yes. Sites in Wakefield are mostly retail parks, showrooms, schools, healthcare and industrial offices, where the drylining package is usually clear and the job is delivering it on programme, with the school and healthcare work phased around the building staying in use.
Yes. The passive fire work is carried out by RWS Contracts Ltd, the group's IFC certificated fire division, which shares the same office and management team. On schemes in Wakefield the rated walls, the ceilings and the fire stopping through them can be let as one package with one point of responsibility.
Wakefield is about 18 miles from the Rotherham yard, so a site visit is normally arranged within a week or two. Starting the works depends on the current contracts, and we would rather give you a real date against your programme than an optimistic one.
Free, no-obligation quotations on every package, anywhere in the UK.