Manchester is the largest fit-out market outside London, and we deliver commercial office, leisure, retail and high-rise residential packages across the city for established main contractors. Partitions, SFS, wall linings, ceilings, fire stopping and plastering in Manchester for main contractors and fit-out companies.

Manchester is a major fit-out market, where packages are larger, programmes are tighter and sites are typically city centre buildings with restricted deliveries and limited storage. The majority of our work in Manchester is office fit outs, with the full range of services available alongside.

Metal stud partitions and Metsec SFS, accurately set out and boarded to specification.

Independent linings and sound and fire-rated wall systems, installed to tested specifications.

Metal frame, suspended grid and tile, acoustic and fire-rated ceiling systems.

Fire stopping and fire-rated installations, certificated through RWS Contracts Ltd.

Tape and joint, skim, render and high-specification internal finishes.

Soft strip, light demolition and site preparation ahead of fit-out.
Across Manchester (M1) it is mostly office fit outs, city centre leisure and retail, high rise residential, with partitions, SFS, wall linings, ceilings, fire stopping and plastering all delivered by one contractor. Manchester is a major fit-out market, where packages are larger, programmes are tighter and sites are typically city centre buildings with restricted deliveries and limited storage. Every package is priced from the drawings and programme, free of charge.
No. Manchester is approximately 37 miles from our head office, a routine distance for our site teams. Travel is included within the package price, and on longer schemes the team remains on site for the duration.
Yes. Manchester is the largest fit-out market outside London, and we deliver commercial office, leisure, retail and high-rise residential packages across the city for established main contractors. If your scheme is near Deansgate, send us the drawings and we will advise on the implications for the drylining package before pricing.
Yes. In Manchester the key consideration is usually logistics. City centre sites typically have booked delivery slots, limited storage and restricted vertical access, so we sequence the package floor by floor and call off materials to suit, keeping the site clear and the programme on track.
Yes. The passive fire work is carried out by RWS Contracts Ltd, the group's IFC certificated fire division, which shares the same office and management team. On schemes in Manchester the rated walls, the ceilings and the fire stopping through them can be let as one package with one point of responsibility.
Manchester is approximately 37 miles from our Rotherham head office, so a site visit is normally arranged within one to two weeks. Start dates depend on current commitments, and we will always confirm a realistic date against your programme.
Free, no-obligation quotations on every package, anywhere in the UK.