Newcastle is the northern end of the regular patch, two hours up the A1, and the student and healthcare schemes there are let as full packages that make the distance worthwhile. Partitions, SFS, wall linings, ceilings, fire stopping and plastering in Newcastle for main contractors and fit-out companies.

Newcastle is a large fit out market, where the packages are bigger, the programmes are tighter and the site is usually a city centre building with restricted deliveries and no room to store board. In practice most of what we are asked for in Newcastle is student accommodation, with the rest of the package available alongside it.

All metal stud, Metsec SFS, set out and boarded square.

Independent linings, sound-rated and fire-rated walls, built to the tested spec.

Metal frame, suspended grid and tile, acoustic and fire-rated ceilings.

Fire stopping and fire-rated installations, certificated and signed off.

Tape and joint, skim, render and high-spec internal finishes.

Strip-out, light demolition and area prep ahead of fit-out.
Across Newcastle (NE1) it is mostly student accommodation, hospital estates, offices and city centre leisure, with partitions, SFS, wall linings, ceilings, fire stopping and plastering all covered by the same company. Newcastle is a large fit out market, where the packages are bigger, the programmes are tighter and the site is usually a city centre building with restricted deliveries and no room to store board. Every package is priced off the drawings and the programme, free of charge.
No. Newcastle is about 107 miles from Rotherham, and the schemes there are the size that justifies it. Travel and lodging are priced into the package rather than added on top, and the team stays near site for the duration of the works.
Newcastle is the northern end of the regular patch, two hours up the A1, and the student and healthcare schemes there are let as full packages that make the distance worthwhile. If your scheme is near Helix, send the drawings across and we will tell you what the building type usually means for the drylining package before anyone prices it.
Yes, and in Newcastle it is mostly about logistics. City centre sites have booked delivery slots, no storage and a lift or a stair for the board, so the package is sequenced floor by floor with the material called off to match, rather than delivered in one drop that blocks the site.
Yes. The passive fire work is carried out by RWS Contracts Ltd, the group's IFC certificated fire division, which shares the same office and management team. On schemes in Newcastle the rated walls, the ceilings and the fire stopping through them can be let as one package with one point of responsibility.
Newcastle is about 107 miles from the Rotherham yard, so a site visit is normally arranged within a week or two. Starting the works depends on the current contracts, and we would rather give you a real date against your programme than an optimistic one.
Free, no-obligation quotations on every package, anywhere in the UK.