Fire stopping, cavity barriers, penetration seals and fire rated installations, installed to tested systems, labelled, photographed and recorded so the fire strategy holds up when someone checks it. The passive fire work is delivered through RWS Contracts Ltd, the group's IFC certificated fire division, so the rated walls RWS builds and the seals through them come from one company.

Compartment walls and floors sealed back to their rated line with batt, mastic, coated board, collars and wraps, installed within the manufacturer's tested scope for the substrate and the service.
Ceiling voids, raised floors and wall cavities divided on the lines the fire strategy shows, installed before the ceiling grid closes the void and photographed while there is still access.
Cable trays, pipes and ducts sealed where they pass through rated elements, and the linear gaps at heads of walls and slab edges closed with tested details.
Every seal is labelled with the system, the rating and the date, photographed and logged against the drawings. The handover pack is the evidence building control and the building owner need.
Yes. The passive fire work is carried out by RWS Contracts Ltd, the group's fire division, which is IFC certificated for fire stopping installation and a member of the Association for Specialist Fire Protection. Both companies share the same office and management team.
Because the rated line then has one point of responsibility. The partition is built to the tested system by the drylining team and the penetrations through it are sealed and recorded by the fire team, so there is no argument between two subcontractors about whose gap it is.
Every seal is labelled, photographed and logged against its location on the drawings. The pack is issued at handover so building control, the fire engineer and the building owner have a record of what was installed, where and to which rating.
Yes. Remedial packages in schools, hospitals, offices and residential blocks are a regular part of the workload. We survey first, agree a schedule of remedials, then work in phases and out of hours where the building needs it.
Yes, through the fire division. Fire door sets are installed as complete assemblies, existing doors are inspected against their certification, and the remedials are carried out and recorded.
The yard and office are in Rotherham and South Yorkshire and the M1 corridor are the weekly patch, but the teams travel. The list below is where the packages come from most often, not a boundary.

All metal stud, Metsec SFS, set out and boarded square.

Independent linings, sound-rated and fire-rated walls, built to the tested spec.

Metal frame, suspended grid and tile, acoustic and fire-rated ceilings.

Tape and joint, skim, render and high-spec internal finishes.

Strip-out, light demolition and area prep ahead of fit-out.
Free, no-obligation quotations on every package, anywhere in the UK.