Dry lining is often the trade that decides whether an interiors programme holds or slips, because so many others depend on it being closed up, boarded and ready to decorate. This guide is for main contractors running commercial, education, healthcare, retail, industrial and residential schemes in and around South Yorkshire. It covers how a package is scoped, what affects cost, how it fits with fire stopping, and what to check before handover.

On most projects the dry lining scope is wider than plasterboard on walls. It normally includes metal stud partitions, independent wall linings, ceiling systems and the tape and jointing or skim finish that follows. On framed buildings it may also include Metsec SFS infill, which needs to be installed and inspected before the envelope and the internal linings can follow.
Be clear early about whether you want a full package or a single scope. Splitting partitions, ceilings and fire stopping between different subcontractors can work, but every split adds an interface where responsibility for a rated element can get lost.
Rates vary with the specification, the building and the programme, so any figure should be treated as a starting point for discussion rather than a quote. As a rough guide, a straightforward single-layer stud partition supplied and fitted might sit somewhere around £30 to £55 per square metre, while multi-layer fire or acoustic walls, tall partitions with deflection heads and high-spec finishes can cost a good deal more.
On refurbishments across Rotherham, Sheffield, Doncaster and Barnsley, a lot of the existing stock is older commercial and industrial buildings with out-of-plumb walls, uneven slabs and services that were never drawn. These things add time, so a survey before pricing nearly always gives a more reliable number.
A fire-rated partition only performs if it is built to the manufacturer's tested system and every penetration through it is sealed with a product tested for that wall type. In practice, many failures happen at the interface: services installed after boarding, the wrong seal used for the substrate, or no record of what was installed where.
At RWS, drylining is carried out by RWS (Plastering & Drylining) Ltd and fire stopping by our sister company RWS Contracts Ltd, the IFC certificated fire division of the RWS Interiors group. One team manages both, so you have a single point of responsibility for the rated wall or ceiling and the penetration seals through it. That makes it easier to produce clear records for your fire strategy and any golden thread information required on higher-risk buildings.
Dry lining sits between first fix and second fix, so its programme depends on others. Agree in advance when the building will be watertight, when M&E first fix will be complete in each zone, and who signs off the void before the second side is boarded.
For larger schemes, working zone by zone with an agreed inspection point before close-up keeps things moving and cuts down on opening up boarded walls later. Allow realistic drying time for skim finishes in winter, particularly in unheated shells.
Walk the rated walls and ceilings with the installer before decorators move in. Check that labels or photographic records for fire stopping match the drawings, that access panels in rated ceilings are themselves rated, and that any late service runs have been resealed properly. Snagging is far cheaper before paint than after.
Yes. We are based in Rotherham and work for main contractors across South Yorkshire and on projects elsewhere in the UK.
Yes. We take on full packages or single scopes such as partitions, ceilings, SFS or finishes, depending on what suits your project.
It removes an interface between trades on rated walls and ceilings. One team is accountable for the system and the penetration seals through it, which makes records and sign-off simpler.